Case Studies
![edf-Construction-Site](https://ec.yvts.co.uk/wp-content/uploads/2020/11/edf-Construction-Site-1024x683.jpg)
Nuclear Power Station
- HVAC for Safety CAT 1 & 2 systems, Nuclear Island C&I.
![Congress Theatre, Eastbourne](https://ec.yvts.co.uk/wp-content/uploads/2020/11/eastbourne-1024x683.jpeg)
Congress Theatre, Eastbourne
- Building management system installed within the grade 2 listed building.
![skyline of the City of London, UK, showing the Leadenhall Building](https://ec.yvts.co.uk/wp-content/uploads/2020/11/iStock-1214335006-1024x593.jpg)
Leadenhall Building, London
- Building management system, fit out contract
![Malthouse Theatre, Canterbury](https://ec.yvts.co.uk/wp-content/uploads/2020/11/malthouse-1024x576.jpg)
Malthouse Theatre, Canterbury
- Trend building management system installed through the newly refurbished site.
![Data Centre, Hemel Hempstead](https://ec.yvts.co.uk/wp-content/uploads/2020/11/datacentre.jpg)
Data Centre, Hemel Hempstead
- Building management system