We design HVAC and mechanical building services for nuclear facilities across the UK generation fleet. Ventilation, air handling, chilled water and heating, taken from concept through detailed design to commissioning support.
SERVICE SUMMARY
DISCIPLINE
Building services and HVAC design
SECTOR
Nuclear generation
STAGE
Concept to commissioning
REGION
UK-wide
CERTIFICATION
ISO 9001 • 14001 • 45001
READY TO START?
OVERVIEW
How nuclear ventilation differs
In a nuclear building, ventilation controls the direction air travels. Air moves from cleaner areas towards areas of higher contamination risk, and never in reverse. That has to hold true during normal operation and under fault conditions. Achieving it means designing pressure cascade, filtration and containment as a single system, and being able to evidence that the system performs as intended.
We design the mechanical building services that deliver this. Our scope covers ventilation and air handling, chilled water and heating systems, ductwork routing and sizing, plant selection and plant space allocation. Each is coordinated with the structural, electrical and control designs it interfaces with. HVAC is rarely a standalone package on a nuclear site: duct routing affects structural loading and penetrations, and the control philosophy forms part of the safety case.
Where site conditions require it, we design, procure and install bespoke plant rather than specifying standard commercial equipment. This is common in nuclear environments, where existing building geometry, load conditions and safety requirements rarely suit off-the-shelf plant.
Our engineers work across the UK nuclear generation fleet, on both operating stations and new build. That includes designing around live plant, existing structure and fixed outage windows, where buildability constraints affect the design as much as performance requirements do.
SCOPE
What we cover
01
Ventilation and containment design
Pressure cascade, filtration and airflow direction designed as a single system, for normal operation and fault conditions. Includes ventilation strategy at concept stage and the calculations supporting it.
02
Mechanical building services design
Air handling, chilled water and heating systems, ductwork routing and sizing, plant selection and plant space allocation, coordinated with structural, electrical and C&I designs.
03
Bespoke plant design and supply
Where existing geometry, load conditions or safety requirements rule out standard commercial equipment, we design, procure and install plant specified for the building it serves.
04
Design evidence and documentation
Component and system justification against design basis and design extension conditions, produced to support the safety case and remain auditable after handover.
HOW IT RUNS
Our design process
We establish what the system must achieve and demonstrate before design work starts, working from the safety case, the client technical specification and the operational requirements of the building. These requirements govern every subsequent decision.
Existing structure, live plant, access and installation routes, interfacing systems and available outage windows are established early. On operating stations this determines what is buildable as much as what is technically preferable.
Design development runs alongside coordination with the structural, electrical and C&I disciplines, with clashes identified and resolved in the model rather than on site. See BIM modelling and management.
Each system is checked against the requirements defined at stage one, and the justification recorded so it remains traceable and auditable after handover.
We stay engaged through procurement, installation and commissioning, resolving design queries raised on site and verifying the installed system performs as designed.
PROOF
Ventilation and mechanical building services design across the UK nuclear generation fleet, covering bespoke plant, multi-discipline coordination and commissioning on live sites.
QUESTIONS WE GET ASKED
Before you enquire
What makes HVAC design different on a nuclear site?
Direction of travel. A commercial system moves air to make a space comfortable. A nuclear system moves air to control where contamination can and cannot go, under normal operation and under fault conditions. That single difference changes ductwork routing, filtration, plant selection, redundancy and how the whole system has to be justified.
Do you work on operating stations as well as new build?
Both. New build gives room to design within the safety case from the start. Operating stations mean designing around live plant, existing structure and a fixed outage window. The constraints are different. The discipline is the same.
Can you support installation and commissioning as well as design?
Yes. Design intent tends to meet reality somewhere around week three of installation, and we would rather be there when it does.
Which standards do you design to?
Our management system is certified to ISO 9001, ISO 14001 and ISO 45001. Design work follows the relevant nuclear ventilation and building services standards for the site, alongside whatever client technical specification applies.